Rolle Building

The strip out of the existing Mechanical and Electrical systems in place , Working in conjunction with Aecom Consultants and the University Staff,  installation of  a new electrical containment system , Lighting Scheme, Small power and containment for overhead projection system.

Installation of new Voice & Data and Fire Alarm systems, Door Access modifications, Alterations to two number 600mm extract flues passing through the space.

Draining heating system and carrying out modifications to the existing radiators, relocation of existing radiators.  Commissioning and testing of the Mechanical and Electrical systems. And the provision of CAD Drawings.

 

Project: Rolle Building 
Main Contractor: Classic Builders Ltd
Consultant: Aecom Consultants
Client: University of Plymouth
Description: Refurbishment of 6th Floor

 